DOT Advisory 2015: Oahu Lane Closures Week Ending Sep 4.

PLEASE NOTE: Lane closure schedules may change at any time without further notice. All projects are weather permitting.

— FARRINGTON HIGHWAY —

1) NANAKULI TO KAENA POINT Lane closure on Farrington Highway in both directions between Lualualei Naval Road and Kaena Point on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for sign replacements.        
2) PEARL CITY (WEEKEND/NIGHT WORK) Two lanes closed on Farrington Highway in the westbound direction between Waiawa Road and the Kamehameha Highway Overpass on Sunday night, Aug. 30, through Friday morning, Sept. 4, from 8 p.m. to 4 a.m., nightly, for the rail project. For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.
3) WAIALUA Lane closure on Farrington Highway in the southbound direction between Olohio Street and Ku Place on Monday, Aug. 31, to Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for utility replacements.
4) WAIANAE Lane closure on Farrington Highway in the northbound direction between Ala Walua Street and Kaulawaha Road on Thursday, Sept. 3, from 8:30 a.m. to 2:30 p.m. for utility replacements.
5) WAIPAHU (WEEKEND/NIGHT WORK) Lane closure of the Farrington Highway eastbound On-Ramp to the H-1 Freeway on Sunday night, Aug. 30, through Friday morning, Sept. 4, from 9 p.m. to 4 a.m., for the rail project. For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.
6) WAIPAHU (WEEKEND WORK) Honolulu Rail Transit will be working on Farrington Highway this week at various locations. Please visit The Rail’s project website for more details at http://www.honolulutransit.org/.

— H-1 FREEWAY —

1) EWA Shoulder closure on the H-1 Freeway in the westbound direction between the Ewa Off-Ramp (Exit 5A) and the Kualakai Parkway Underpass on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for utility installations.
2) HONOLULU Closure on the Kilauea Avenue Off-Ramp (Exit 27) from the H-1 Freeway in the westbound direction on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m., for storm drain maintenance.


3) HONOLULU (WEEKEND/NIGHT WORK) Lane closures on the H-1 Freeway in the eastbound direction between the Punahou Street Off-Ramp (Exit 23) and Ainakoa Avenue on Sunday, Aug. 30, through Friday morning, Sept. 4, from 9 p.m. to 4:30 a.m., for striping installations.  4) HONOLULU Lane closure on the 6th Avenue Off-Ramp (Exit 25B) of the H-1 Freeway in the eastbound direction on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for guardrail repairs.
5) KAHALA Shoulder closure of the Kilauea Avenue Off-Ramp (Exit 27) from the H-1 Freeway in the westbound direction on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for storm drain cleaning.
6) PEARL CITY (WEEKEND/NIGHT WORK) Up to two lanes closed on the H-1 Freeway in the eastbound direction between the Kamehameha Highway Overpass and the Waiawa Road Overpass on Sunday night, Aug. 30, through Friday morning, Sept. 4, from 8 p.m. to 4 a.m., nightly, for the rail project. The number of lanes closed will vary depending on the location of the roadwork. For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.
7) PEARL CITY TO WAIPAHU Two right lanes closed on the H-1 Freeway in the westbound direction between the Pearl City/Waimalu Off-Ramp (Exit 10) and the H-1/H-2 Split on Monday, Aug. 31, through Friday, Sept. 4, from 9:30 a.m. to 2:30 p.m. for deck widening. For more information, visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.
8) PEARL CITY (WEEKEND/NIGHT WORK) Closure of the Moanalua Road On-Ramp to the H-1 Freeway in the westbound direction from 8 p.m. Saturday night, Aug. 29, through 10 a.m. Sunday morning, Aug. 30, for deck widening and concrete pours. For more information, please visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.
9) PEARL CITY TO WAIPAHU (WEEKEND/NIGHT WORK) Right lane closures on the H-1 Freeway in the westbound direction between the Pearl City/Waimalu Off-Ramp (Exit 10) and the Waipahu Off-Ramp (Exit 8B) from 8 p.m. Saturday night, Aug. 29, through 4 a.m. Monday morning, Aug. 31, for deck widening. · Three right lanes closed from 8 p.m. Saturday, Aug. 29, through 10 a.m. Sunday morning, Aug. 30. · Two right lanes closed from 10 a.m. Sunday, Aug. 30, through 4 a.m. Monday morning, Aug. 31. For more information, please visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.
10) PEARL HARBOR Right lane closure of the Arizona Memorial/Stadium Off-Ramp (Exit 15A) of the H-1 Freeway to Kamehameha Highway in the westbound direction on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 2:30 p.m. for The Rail Project. For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.
11) SALT LAKE TO HONOLULU INTERNATIONAL AIRPORT (NIGHT WORK) Partial closures of the Keehi Interchange ramps on the H-1 Freeway in the eastbound direction on Monday night, Aug. 31, through Thursday morning, Sept. 3, from 6 p.m. to 5 a.m., nightly, for deck sealing.  All ramps will remain open. Motorists are advised to pay attention to all traffic control signs, allow for extra travel time and slow down in the work zone area.
12) WAIPAHU (WEEKEND/NIGHT WORK) Closure of the Waipahu Off-Ramp (Exit 8B) from the H-1 Freeway in the westbound direction on Sunday night, Aug. 30, through Friday morning, Sept. 4, from 9 p.m. to 4 a.m., nightly, for the rail project. For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.

— H-2 FREEWAY —

1) MILILANI TO WAIPIO Lane closures on the H-2 Freeway in both directions between Ka Uka Boulevard Overpass and the Wahiawa Off-Ramp (Exit 8) on Wednesday, Sept.2, through Thursday, Sept. 3, from 9 a.m. to 11:30 a.m., for the bridge joint repair project.

— H-3 FREEWAY —

1) KAILUA Lane closure on the H-3 Freeway in the Kailua-bound direction at the Likelike Highway Off-Ramp (Exit 9) on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m., daily, for guardrail repairs.
2) KANEOHE Lane closure on the H-3 Freeway in both directions between the Mokapu Saddle Road Underpass and the Kamehameha Highway Off-Ramp (Exit 11) on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m., daily, for median maintenance.

— KALANIANAOLE HIGHWAY —

1) HAWAII KAI Lane closure on Kalanianaole Highway in the westbound direction between Lunalilo Home Road and West Hind Drive on Monday, Aug. 31, through Friday, Sept. 4, from 9 a.m. to 3 p.m. for pavement striping installations part of the Kalanianaole Highway Resurfacing project.
2) NIU VALLEY Lane closure on Kalanianaole Highway in both directions between Kuliouou Road and Puuikena Drive on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for guardrail work.
3) NIU VALLEY Right turn lane closed on Kalanianaole Highway in the westbound direction between Kuliouou Road and Elelupe Road on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for sidewalk removal and utility installations.
4) WAIMANALO Alternating lane closure on Kalanianaole Highway in both directions between Kumuhau Street and Makapuu Lighthouse Road on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for tree trimming.

— KAMEHAMEHA HIGHWAY —

1) HALEIWA Lane closure on Kamehameha Highway in both directions between Waimea Valley Road and Kapuhi Street on Monday, Aug. 31, through Wednesday, Sept. 2, daily, from 8:30 a.m. to 3 p.m. for utility maintenance.
2) KAAAWA (WEEKEND/NIGHT WORK) 24/7 lane closure on Kamehameha Highway in the northbound direction between Keo Place and Trout Farm Road for emergency shoreline improvements.  Traffic will be contraflowed in the remaining open lane.  Motorists are advised to expect delays.
3) KAAAWA Lane closure on Kamehameha Highway in the southbound direction between Puakenikeni Road and Pohuehue Road on Monday, Aug. 31, through Friday, Sept. 4, daily, from 8:30 a.m. to 3 p.m. for road repairs.
4) KAAAWA Lane closure on Kamehameha Highway in the southbound direction between Haumalani Road and Johnson Road on Monday, Aug. 31, through Friday, Sept. 4, daily, from 8:30 a.m. to 2:30 p.m. for utility installations.
5) KAHALUU Lane closure on Kamehameha Highway in the southbound direction between Waihee Road and Kahekili Highway on Monday, Aug. 31, from 8:30 a.m. to 2:30 p.m. for utility installations.
6) KAHUKU Lane closure on Kamehameha Highway in both directions between Kuilima Drive and Pualalea Street on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 2:30 p.m. for utility installations.
7) LAIE Lane closure on Kamehameha Highway in both directions between Malaekahana Valley Road and Akahi Gulch Road on Monday, Aug. 31, through Friday, Sept. 4, daily, from 8:30 a.m. to 3 p.m. for road repairs.
8) MILILANI Lane closures on Kamehameha Highway in both directions between Ka Uka Boulevard and Waihau Street on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for guardrail and pavement striping installations. One lane in both directions will be open for motorists at all times. Motorists are advised to expect traffic delays and use alternate roadways such as Kuahelani Avenue, Meheula Parkway, Lanikuhana Avenue, Ka Uka Boulevard and the H-2 freeway.
9) PEARL CITY TO AIEA (WEEKEND/NIGHT WORK) Honolulu Rail Transit will be working on Kamehameha Highway this week at various locations. · 24/7 lane closures in both directions between Waiawa Road and Acacia Road. · 24/7 lane closures in both directions between Acacia Road and Waimano Home Road. ·   24/7 lane closures in both directions between Lipoa Place and Pali Momi Street. · Lane closures in the westbound direction between Pali Momi Street and Honomanu Street, Monday through Friday. · Lane closures in both directions between Puu Poni Street and Kaonohi Street, Monday through Friday. · Lane closures in the westbound direction between Salt Lake Boulevard and Honomanu Street, Monday through Friday. Please visit The Rail’s project website for more details at http://www.honolulutransit.org/.
10) PUNALUU Lane closure on Kamehameha Highway in the southbound direction between Punaluu Valley Road and Kina Place on Tuesday, Sept. 1, from 8:30 a.m. to 2:30 p.m. for utility installations.
11) WAHIAWA (WEEKEND WORK) All lanes closed on Kamehameha Highway in both directions between Whitmore Avenue and Kilani Avenue at the Karsten Thot Bridge on Saturday, Aug. 29, from 6 a.m. to 2 p.m. for emergency tree removal.

— NIMITZ HIGHWAY —

1) HONOLULU (WEEKEND/NIGHT WORK) Lane closures on Nimitz Highway in both directions between Libby Street and River Street on Sunday night, Aug. 30, through Friday morning, Sept. 4, from 8:30 p.m. to 3:30 a.m. for sewage repairs.
2) HONOLULU Right lane closure on Nimitz Highway in the eastbound direction between Alakawa Street and Pacific Street on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for sidewalk repairs.
3) PEARL HARBOR Right lane closure on Nimitz Highway at the Arizona Memorial/Stadium Off-Ramp to Kamehameha Highway in the westbound direction on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 2:30 p.m. for the rail project.  For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.
4) SALT LAKE TO HONOLULU INTERNATIONAL AIRPORT (WEEKEND/NIGHT WORK) Two right lanes closed on Nimitz Highway in the westbound direction between Catlin Drive and Aolele Street from 9 p.m. Friday, Aug. 28, through 12:01 a.m. Monday morning, Aug. 31, as a safety precaution due to deck repairs happening above.

— NIMITZ HIGHWAY MAKAI FRONTAGE ROAD —

1) HONOLULU Single lane closure on the Nimitz Highway Makai Frontage Road in the eastbound direction between Center Drive and Valkenburgh Street on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 2:30 p.m. for the rail project.

For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.

— PALI HIGHWAY —

1) NUUANU Lane closures on the Pali Highway in both directions between Puiwa Road and Hinalo Place on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for road repairs.

— ALA MOANA BOULEVARD —

1) HONOLULU Lane closure on Ala Moana Boulevard in both directions between Queen Street and Atkinson Drive on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m., daily, for concrete pumping and deliveries.
2) HONOLULU Right lane closed on Ala Moana Boulevard in the eastbound direction between Kahanamoku Street and Kalakaua Avenue on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m., daily, for sewage maintenance.
3) HONOLULU Lane closure on Ala Moana Boulevard in the westbound direction between Kalakaua Avenue and Ena Road on Monday, Aug. 31, from 8:30 a.m. to 11 a.m. for tree trimming.

— VINEYARD BOULEVARD —

1) HONOLULU Roving single lane closures on Vineyard Boulevard in both directions between Palama Street and the eastbound H-1 Freeway On-Ramp on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for road repairs and landscape maintenance.

— LILIHA STREET —

1) HONOLULU Lane closure on Liliha Street in the northbound direction between North King Street and Vineyard Boulevard on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m., daily, for sidewalk reconstruction.

— MIDDLE STREET —

1) KALIHI (WEEKEND/NIGHT WORK) Alternating lane closure on Middle Street in the southbound direction between North King Street and Kamehameha Highway on Monday night, Aug. 31, through Saturday morning, Sept. 5, from 8 p.m. to 4 a.m., nightly, for the Middle Street Pavement Reconstruction project. There will also be a 24/7 southbound lane closure and sidewalk closure on the west side of Middle Street. Signage will be posted instructing pedestrians to use the east sidewalk.

—MOANALUA ROAD —

1) HALAWA TO PEARL CITY Lane closures at various locations on Moanalua Road in both directions between the Halawa Interchange and the H-1/H-2 Split on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for guardrail repairs.

—MOANALUA FONTAGE ROAD —

1) MOANALUA Right lane closure on Moanalua Frontage Road in the northbound direction between Ala Napunani Street and Aliamanu Drive on Monday, Aug. 31, from Friday, Sept. 4, from 8:30 a.m. to 3 p.m. for utility installations.

— MOKAPU BOULEVARD —

1) KAILUA Lane closure on Mokapu Boulevard in the Kaneohe-bound direction between Ilipilo Street and Ilikala Place on Monday, Aug. 31, through Friday, Sept. 4, from 8:30 a.m. to 3 p.m., daily, for road repairs.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: