Transportation Update: Safety Projects Along Farrington Hwy (1/10/14)

From: Jadine Urasaki
Sent: Friday, January 10, 2014 12:59 PM
To: Sen. Maile Shimabukuro
Subject: Re: Follow up Question re Median Barriers

Aloha Senator,

These are the current safety projects that we are working on along Farrington Highway:

1. PROJECT TITLE: Farrington Highway Intersection Improvements, at Nanakuli Avenue and Haleakala Avenue
SCOPE OF WORK: Widening of Farrington Highway between Nanakuli Stream and Helelua Street to facilitate construction of an auxiliary lane, 8-foot wide shared-use path; realignment of the existing historic railroad track, drainage systems, relocation of existing utilities and traffic signal system.
CON ESTIMATE:  $ 10,068,863.00
Construction to commence shortly

2. PROJECT TITLE: Farrington Highway Drainage Improvements
Vicinity of Princess Kahanu Avenue
SCOPE OF WORK: Drainage improvements to mitigate flooding during heavy downpour/high surf. Work involves replacing existing 12″ drain with 24″ drainline, convert existing drywell into a drain inlet, reconstruct existing drain inlet, install manholes, hydro-mulch, and other related improvements.
CON ESTIMATE: $750,000.00
ESTIMATED SCHEDULE: Bid Open Dec. 2014

3. PROJECT TITLE: Farrington Highway, Replacement of Maipalaoa Bridge
SCOPE OF WORK: This project will replace the existing Maipalaoa Bridge including the addition of piers, asphalt pavement reconstruction, utility relocation and other related improvements.
CON ESTIMATE: $14.7 Million
ESTIMATED SCHEDULE: Bid Open Dec. 2014/Jan 2015

4. PROJECT TITLE: Farrington Highway Resurfacing, Vicinity of Kili Drive to Satellite Tracking Station Road
SCOPE OF WORK: Cold planing, resurfacing, reconstructing weakened pavement areas, replace and install guardrails, end treatments, slope stabilization, installing new concrete bus pads, installing loop detectors and traffic signal head back plates,            adjusting utility manholes and pullboxes, pavement markings and striping
CON ESTIMATE: $11.0 Million
ESTIMATED SCHEDULE: Bid Open January/February 2015

5. PROJECT TITLE: Farrington Highway, Replacement of Makaha Bridges 3 and 3A
SCOPE OF WORK: Replacement of two existing wooden bridge structures with two new reinforced concrete bridge structures.
CON ESTIMATE:  $16,411,374.00
ESTIMATED SCHEDULE:  End of 2014

Thank you.
Jadine Urasaki, P.E. LEED AP
Deputy Director – Projects
State of Hawaii Department of Transportation
869 Punchbowl Street, Suite 500
Honolulu, Hawaii 96813

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: